Capabilities

From geology to the mine plan.

The whole workflow, and the small jobs between. Geological data, project criteria, design, sequencing, scheduling and reporting in your existing software.

01 · design

Design, then change what matters.

Mine design, development, declines, stopes and stope optimisation. Build a design or change selected areas without starting the whole mine again.

Example prompt“Change the development on these levels.”

02 · scheduling

Turn the design into a workable schedule.

IS and scheduling: production fields, dependencies, priorities, resources, constraints and levelling. Work through the connected plan in your existing software.

Example prompt“Update the production fields, change the priorities and re-level the schedule.”

03 · caving

Plan caving from footprint to development.

Block-cave and sublevel-cave planning. Compare footprints, develop extraction layouts and work through the development.

Example prompt“Build the extraction layout from this footprint.”

04 · geology

From drillholes to a resource model.

Check the drilling, build geological domains, composite samples, investigate continuity, estimate grades and validate the model. Produce the supporting figures and report.

Example prompt“Interrogate these solids against the updated block model.”

05 · Everyday work

The work between the big decisions.

Reorganise layers, apply filters, set legends, write attributes and produce reports. Clear the repetitive work without stepping through every dialog.

Example prompt“Reorganise these layers and apply the grade legend.”

06 · ventilation

Understand the air and heat underground.

Airflow estimation and heat simulations with Bergbau’s own ventilation engine. Ventilation modelling sits alongside the rest of the mine plan.

Example prompt“Estimate airflow and simulate heat through this network.”

07 · criteria and trade-offs

Work to your project basis.

Read criteria, costs, rates and profiles from your workbook or study documents. Derive cut-offs, compare pit and underground cases, and save the agreed basis with the project for later work.

Prompt“Use this workbook to set our criteria and compare the pit depths against the underground inventory.”

08 · access and materials handling

Connect the mine, not just the levels.

Compare truck and conveyor concepts, shared handling and crusher locations. Develop the orepasses, haul roads, conveyor flights and access connections to the selected arrangement and criteria.

Prompt“Compare these handling arrangements, then connect the selected crusher to the orepasses and surface.”

09 · design to sequence

Give the plan its mining logic.

Set up Deswik.IS, attribute the design, build and interrogate activities, and define production cycles. Apply development and production dependencies, check the sequence and save the rules so it can be rebuilt after design changes.

Prompt“Build tasks from this design and sequence production after its serving development.”

10 · reporting and auditing

Read back what the plan delivers.

Build native production and cost reports, reconcile monthly, annual and mine totals, and export to Excel. Review model inputs, geometry, dependencies and calculation logs; compare cases and explain what controls the result.

Prompt“Check this schedule, reconcile the reports and export annual tonnes, weighted grades and costs to Excel.”

Bergbau Agentmining engineers · geologists

One agent for geology and mine planning

Runs on Deswik Datamine Supervisor Micromine Leapfrog Ventsim

One product covers both areas of work. Bergbau runs inside the assistant your team already uses, across your existing software and files: your email, your SharePoint, the rest of Microsoft 365.

Mine planning and engineering
planning and scheduling
01

Mine design through to trade off studies: most of what a planner does, with a prompt.

Mine design, development and stope optimisation
Sequencing, levelling and constraints
Attributing, calculated fields and formulas
Block model editing and interrogation
Filters, views, legends and reports
Data analysis and trade off studies
Geology and resource estimation
modelling and resource
02

From drillholes to a checked resource model and report, connected to the rest of the study.

Data validation and QAQC
Compositing and statistics
Domaining and wireframe modelling
Grade estimation and validation
Classification and reporting
Reconciliation and exports to planning

Your existing software

Deswik · Datamine · Supervisor · Micromine · Leapfrog · Ventsim

Connect geology, mine planning and ventilation in the software your team already licences. Support varies by package and task; tell us what your team needs and we’ll confirm the current coverage.